Quantcast
Channel: SCN : Discussion List - SAP ERP 6.0 Upgrade
Browsing all 1111 articles
Browse latest View live

Image may be NSFW.
Clik here to view.

solution manager: Upgrade from ERP6 ehp4 to ERP6 ehp6

Hi All, I am trying to upgrade ERP6 ehp4 to ERP6 ehp6 using Solution Manager.It throws following error while upgrade.Kindly help.   

View Article


How to setup Disaster Recovery system for SAP ERP 6.0

Hi I am new in SAP basis and I have to setup DR site for SAP ERP 6.0 on windows platform with SQL 2008 Database so I am looking for instructions and prerequisite guide for DR.

View Article


SPAU transaction

Hi SAP Guru, The SPAU  Transaction should be perform after oder before we have activate the business functions? What ist the best way to determinate the test scope for an  integration Testing Thanks Felix

View Article

SAP ROUTER getting restart every week

Hi Friends ,  In My Organization our employees are facing problem with SAP CONNECTION , every one week SAP ROUTER is getting restart , for 2, 3 minits ,In that time we are unable to connect our...

View Article

Image may be NSFW.
Clik here to view.

Error in MAIN_SHDPREPUT/START_SHDI_PREPUT

Hi ,Currently performing stack upgrade using SUM tool  stopped due to error in phase MAIN_SHDPREPUT/START_SHDI_PREPUT I'm getting the below error in Preprocessing Phase. Please advise if you have...

View Article


some CDS-view missing

hi, experts! I have got some errors while EHP7 SP4 installThere are the following CDS-views...

View Article

SUM 1.0 SP11 UPDATE phase Configuration – Summary

Hello Friends We are upgrading our ECC 6.0 system to EHP7 sp02.We are using SUM tool for the same and SUM version is 1.0 SP11, AIX 6.1 TL09, ORACLE 11.2.0.3Our environment is installed as CI DB on...

View Article

EHP7 upgrade in PREP_INIT/JOB_RSUPDTEC

Hello, I am stuck in PREP_INIT/JOB_RSUPDTEC phase, where the job RSUPDTEC fails. RSUPDTEC log: 1 ETQ201 Entering upgrade-phase "PREP_INIT/JOB_RSUPDTEC" ("20140725175743")2 ETQ367 Connect variables are...

View Article


MAIN_SHDCRE/SUBMOD_SHDDBCLONE/ADJUSTCHK_EHPI - EXSORT_NOT_ENOUGH_MEMORY

Hello Friends We are upgrading our ECC 6.0 system to EHP7 sp02.We are using SUM tool for the same and SUM version is 1.0 SP11, AIX 6.1 TL09, ORACLE 11.2.0.3Our environment is installed as CI DB on...

View Article


EHP6 Upgrade - Checks after phase MAIN_TRANSEXEC/TABIM_TRANS were negative!

Hi, I have got an error in the execution phase MAIN_TRANSEXEC/TABIM_TRANS-  4 ETW000 date&time: 08.03.2013 - 22:37:114 ETW000 2 errors occured.4 ETW000 end of log fragment of child 000000296844...

View Article

Can I manually import a transport (SPDD) in my shadow instance during the A

I'm in the process of upgrading our 4.6c QA clustered environment to ECC 6.0 along with a hardware migration (64bit win 2003 and SQL2005) I've sucesfully upgraded our SBX and DEV environment...

View Article

"Upgrade is running! No import possible" in ACT_UPG

Hello, I´m applying EHP4 in ECC6 with sapehpi. In preprocessing phase ACT_UPG, in the beggining, the system asks if I want to make adjustments in SPDD. I have already made this adjustments in DEV...

View Article

Image may be NSFW.
Clik here to view.

Upgrade SAP EH7 - Error in phase SCEXEC_ALIAS table J_1BLEGAL.NAT

Hi all,    I've  a problem on the upgrade ERP to EHP7 in phase SCEXEC_ALIAS, the error is "Cannot use drop view with 'dom_shd.J_1BLEGAL.NAT' because it is a table...I can see thi erron in...

View Article


Restore offline backup with DIFFERENT SID

Dear Expertsi have query from one of our client that they want change SID of the system i think rather then new installation whole process and config all stuff i think to take OFFLINE back up database...

View Article

Severe error(s) occurred in phase PREP_INPUT/SUMCHK!

Hi , while performing the EHP7 upgrade during the extraction phase I faced below error. Severe error(s) occurred in phase PREP_INPUT/SUMCHK!Last error code set: tp failed with return code 232, check...

View Article


Listener not getting started after db upgrade from 10.2.0.2.0 to 11.2.0.2.0

Dear all i have successfully upgrade oracle database from 10.2.0.2.0 to 11.2.0.2.0 through dbua but after upgrade i have copied listener and tnsname from realese to and new release then i follow these...

View Article

Request not move bcaz of component version does not match

Dear Expertswe have upgraded our ehp4 server to ehp6 but now we found while testing our ehp6 test server some pgm are not moved to ehp6 test server as we have move some request to prodution server...

View Article


MRP

hello every body can any one help  about 1- the main conditions in MRP 2- the configuration OF MRP step by step  3- and if i can find any videos tutorials about MRP

View Article

Image may be NSFW.
Clik here to view.

unable to start shadow instance MAIN_SHDPREPUT/START_SHDI_PREPUT

Hi , During the EHP7 upgrade pre processing phase Now the shadow instance is not starting up main issue with disp+work .exe  is stopped, I have attached the DISP & other logs below and tried few...

View Article

XPRA error when updating ECC system to EHP6

Hi, during XPRA I get the following error: A2 EFINB_TR 097 Transport tool FINBASIS: Client cascade for client "001" started A2EEFINB_TR 032 No suitable RFC destination could be found"001" A2 EFINB_TR...

View Article
Browsing all 1111 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>