Hello,
I´m applying EHP4 in ECC6 with sapehpi. In preprocessing phase ACT_UPG, in the beggining, the system asks if I want to make adjustments in SPDD. I have already made this adjustments in DEV system, but I released the request manually and so it is not included automatically in the import on QA system.
My problem is now I want to import this request in QA system in this phase, instead of, making the adjustments again.
But the system doesn´t allow me to do so:
ERROR: Upgrade is running! No import possible.
tp returncode summary:
TOOLS: Highest return code of single steps was: 0
ERRORS: Highest tp internal error was: 0253
tp finished with return code: 253
meaning:
system in upgrade, no import possible
I´ve done a UNLOCK_EU and the error is the same.
How can I import my DEV request now to adjust the dictionary in QA at this point in ACT_UPG?
Thanks
Marco Galhardi